Let's Shape Your Ideas and Projects Together
Get a Quick Price!

PRODUCT DESCRIPTION
Product Name | Beylerbeyi |
m² | 53m² |
Number of Floors | 1 |
Number of Rooms | 2+1 |
Living Room | 24m² |
Bedrooms | 10-10m² (2 units) |
Kitchen | Open Kitchen |
Bathroom | 4m² |
Entrance Hall | 5m² |
Veranda | - |
Balcony | - |
Our prefabricated houses are made from A1 class fire-resistant non-combustible materials and are economical. Thermal balance is supported by PVC windows. All homes are delivered to our customers with calculations suitable for every region. Projects are revised and realized in accordance with the customers’ requests.
Building Height | 250 cm |
Interior Wall | 6 cm – 10 cm (Optional) |
Interior Door | American Door |
Windows | White PVC Window |
Electrical Installation | Flush Mounted |
Interior Wall Paint | Plastic Interior Paint |
Exterior Walls | 10 cm |
Exterior Door | Steel Door |
Balcony Door | White PVC Door |
Roof Coating | Painted Galvanized Sheet, (Optional) Metal Tile, Shingle Coating |
Plumbing | Flush Mounted |
Exterior Wall Paint | Silicone-Based Exterior Paint |
1. Assembly of all building elements (wall panels and joining components)
2. Installation of exterior (Steel Door) and interior doors (American Doors)
3. Installation of all windows including double glazing
4. Electrical wiring materials and applications inside the building (sockets, switches, circuit breakers, lighting fixtures)
5. Plumbing materials and applications (sewage and clean water piping)
6. If included in the project, supply of sanitary ware (toilet, sink, shower tray, faucets) — installation not included
7. Complete ceiling covering, ceiling insulation, and roof coating
8. Painting, priming, and sealing (silicone) for interior & exterior ceilings and metal components
9. Loading of materials onto the transport vehicles provided by the buyer is the responsibility of the seller.
1. Ground concrete and all excavation works
2. Floor and wall covering works (concrete, ceramic, tiles, carpet, etc.)
3. Necessary permits for building installation
4. Transportation, transportation insurance, and provision of crane or scaffolding if necessary
5. External connections to the building (electricity, grounding line, sewage, clean water, etc.)
6. Heating and cooling systems (radiators, air conditioners, etc.)
7. Kitchen upper and lower cabinets and bathroom cabinets
8. Telephone, TV, computer, UPS, data systems and accessories
9. Electrical supply to be used during assembly
10. Accommodation and meal costs for the team in out-of-town installations
11. Protection of materials from theft at the installation site