Let's Shape Your Ideas and Projects Together
Get a Quick Price!

PRODUCT DESCRIPTION
Product Name | Viranşehir |
m² | 55m² |
NUMBER OF FLOORS | 1 |
NUMBER OF ROOMS | 2+1 |
LIVING ROOM | 24m² |
BEDROOM | 10-10m² (2 units) |
KITCHEN | American Kitchen |
BATHROOM | 4m² |
ENTRYWAY | 5m² |
VERANDA | 2m² |
BALCONY | - |
Prefabricated houses are made from fire-resistant A1 class non-combustible materials and are cost-effective.
Heat balance is supported with PVC windows. Our houses are delivered to customers with calculations suitable for each region.
Projects are revised and customized to meet our customers' specific needs.
Building Height | 250 cm |
Interior Walls | 6 cm – 10 cm (Optional) |
Interior Door | American Door |
Windows | White PVC Windows |
Electrical System | Concealed Wiring |
Interior Paint | Plastic Interior Paint |
Exterior Walls | 10 cm |
Exterior Door | Steel Door |
Balcony Door | White PVC Door |
Roof Covering | Painted Galvanized Sheet (Optional) Metal Tile, Shingle Roof |
Plumbing System | Concealed Plumbing |
Exterior Paint | Silicone-Based Exterior Paint |
Assembly of all building elements (Wall panels and connection elements)
Installation of the exterior door (Steel Door) and interior doors (American Door)
Installation of all windows, including double-glazed glass
Electrical installation materials and applications inside the building (outlets, switches, fuses, lighting fixtures)
Plumbing materials and applications (dirty and clean water pipe installation)
Provision of sanitary ware materials (toilet, sink, shower tray, faucets) if included in the project, excluding installation
Complete ceiling covering, ceiling insulation, roof covering
Interior & Exterior Ceiling, Metal Parts Painting and Priming, and Silicone Application
Loading of materials onto the transport vehicles on the buyer's side, the seller is responsible for this.
Ground concrete and all excavation work
Floor and wall covering works (screed, ceramic, tiles, carpet, etc.)
Necessary permits for building construction
Transportation, transport insurance, and provision of crane and scaffolding if necessary
External connections outside the building (electricity, grounding line, sewage and clean water, etc.)
Heating and cooling systems (radiators, air conditioning, etc.)
Kitchen upper and lower cabinets and bathroom cabinets
Telephone, TV, Computer, UPS, Data installations and fixtures
Electrical supply to be used during the installation
Accommodation and meal costs for the team in out-of-city installations
Protection of materials from theft at the installation site