Let's Shape Your Ideas and Projects Together
Get a Quick Price!

PRODUCT DESCRIPTION
Product Name | Kartepe |
m² | 62m² |
FLOORS | 1 |
ROOMS | 2+1 |
LIVING ROOM | 18m² |
BEDROOM | 10-12m² (2 units) |
KITCHEN | 7m² |
BATHROOM | 5m² |
ENTRANCE | 3m² |
VERANDA | 7m² |
BALCONY | - |
Prefab houses are made of fire-resistant A1-class non-flammable materials and are economical.
The thermal balance is supported by PVC windows. Our houses are delivered to our customers with calculations suitable for each region.
Projects are revised to bring our customers' wishes to life.
Building Height | 250 cm |
Interior Wall | 6 cm – 10 cm (Optional) |
Interior Door | American Door |
Windows | White PVC Window |
Electrical Installation | Concealed Wiring |
Interior Paint | Plastic Interior Paint |
Exterior Walls | 10 cm |
Exterior Door | Steel Door |
Balcony Door | White PVC Door |
Roof Covering | Painted Galvanized Sheet, (Optional) Metal Tile, Shingle Roofing |
Sanitary Installation | Concealed Wiring |
Exterior Paint | Silicone-based Exterior Paint |
1. Installation of all building components (Wall panels and joining elements)
2. Installation of the exterior door (Steel Door) and interior doors (American Door)
3. Installation of all windows, including double-glazed windows
4. Electrical installation materials and applications inside the building (outlets, switches, fuses, types of lighting fixtures)
5. Sanitary installation materials and applications (hot and cold water piping)
6. Procurement of sanitary items in the project (toilet, sink, shower tray, faucets), excluding installation
7. All ceiling coverings, ceiling insulation, roof covering
8. Interior & Exterior Ceiling, Metal Component Painting and Priming, and Siliconing Process
9. Loading of materials into the vehicles sent by the buyer, which is the seller's responsibility.
1. Ground concrete and all types of excavation work
2. Floor and wall covering work (screed, ceramic, tiles, carpet, etc.)
3. Necessary permits for building construction
4. Transportation, transportation insurance, and, if necessary, crane and scaffold provision
5. External connections outside the building (electricity, grounding line, sewage and clean water, etc.)
6. Heating and cooling systems (radiators, air conditioning, etc.)
7. Kitchen upper and lower cabinets and bathroom cabinets
8. Telephone, TV, Computer, UPS, Data systems, and fixtures
9. Provision of electricity to be used during installation
10. Accommodation and meal costs for the team in out-of-town installations
11. Protection of materials at the installation site against theft.