Let's Shape Your Ideas and Projects Together
Get a Quick Price!

PRODUCT DESCRIPTION
Product Name | Antakya |
m² | 68m² |
NUMBER OF FLOORS | 1 |
NUMBER OF ROOMS | 2+1 |
LIVING ROOM | 19m² |
BEDROOM | 10-15m² (2 units) |
KITCHEN | 6m² |
BATHROOM | 5m² |
HALLWAY | 6m² |
VERANDA | 7m² |
BALCONY | - |
Prefabricated houses are made from fire-resistant A1 class non-combustible materials and are economical.
The thermal balance is supported by PVC windows. Our houses are delivered to customers with calculations suitable for each region.
Projects are revised and customers' requests are realized.
Building Height | 250 cm |
Interior Wall | 6 cm – 10 cm (Optional) |
Interior Door | American Door |
Windows | White PVC Window |
Electrical Installation | Below Plaster |
Interior Paint | Plastic Interior Paint |
Exterior Walls | 10 cm |
Exterior Door | Steel Door |
Balcony Door | White PVC Door |
Roof Covering | Painted Galvanized Sheet, (Optional) Metal Tile, Shingle Covering |
Plumbing | Below Plaster |
Exterior Paint | Silicone Exterior Paint |
1. Installation of all building components (Wall panels and joint components)
2. Installation of the exterior door (Steel Door), interior doors (American Door)
3. Installation of all windows, including double glazing
4. Electrical installation materials and applications within the building (outlets, switches, fuses, lighting fixtures)
5. Plumbing materials and applications (hot-cold water piping)
6. Procurement of sanitary ware (toilet, sink, shower tray, faucets) if available in the project, excluding installation
7. All ceiling cladding, ceiling insulation, roof covering
8. Interior & Exterior Ceiling, Metal Parts Painting, Priming, and Silicone Sealing
9. Loading of materials onto vehicles sent by the buyer is the responsibility of the seller.
1. Ground concrete and all types of excavation works
2. Floor and wall cladding works (cement, ceramic, tiles, carpet, etc.)
3. Necessary permits for the construction of the building
4. Transport, transport insurance, and if necessary, crane and scaffolding provision.
5. External connections of the building (Electricity, grounding line, wastewater and clean water, etc.)
6. Heating and cooling systems (radiator, air conditioning, etc.)
7. Kitchen upper and lower cabinets and bathroom cabinets
8. Telephone, TV, Computer, UPS, Data installation and fixtures.
9. Provision of electricity to be used during installation.
10. Accommodation and meal expenses for the team during off-city installations.
11. Protection of materials against theft at the installation site.