Let's Shape Your Ideas and Projects Together
Get a Quick Price!

PRODUCT DESCRIPTION
Product Name | Bandırma |
m² | 72m² |
Number of Floors | 1 |
Number of Rooms | 2+1 |
Living Room | 17m² |
Bedroom | 12-15m² (2 units) |
Kitchen | 12m² |
Bathroom | 5m² |
Hallway | 7m² |
Veranda | 4m² |
Balcony | - |
Prefabricated houses are produced from fire-resistant A1 class non-flammable materials and are cost-effective.
Heat balance is supported by PVC windows. Our houses are delivered to our customers with calculations suitable for each region.
Projects are revised to realize our customers' wishes.
Building Height | 250 cm |
Interior Wall | 6 cm – 10 cm (Optional) |
Interior Door | American Door |
Windows | White PVC Window |
Electrical Installation | Under Plaster |
Interior Wall Paint | Plastic Interior Wall Paint |
Exterior Walls | 10 cm |
Exterior Door | Steel Door |
Balcony Door | White PVC Door |
Roof Coating | Painted Galvanized Sheet, (Optional) Metal Tile, Shingle Coating |
Sanitary Installation | Under Plaster |
Exterior Wall Paint | Silicone-Based Exterior Wall Paint |
1. Installation of all building components (wall panels and joint elements)
2. Installation of the exterior door (Steel Door) and interior doors (American Door)
3. Installation of all windows, including double glazing
4. Electrical installation materials and applications inside the building (outlets, switches, fuses, types of lighting fixtures)
5. Plumbing materials and applications (wastewater and clean water pipe installations)
6. Procurement of sanitary materials in the project (toilet, sink, shower tray, faucets), excluding the installation
7. All ceiling coverings, ceiling insulation, roof covering
8. Interior & Exterior Ceiling, Metal Parts Painting and Priming, and Silicone Coating
9. Loading of materials onto vehicles sent to the buyer's side is the responsibility of the seller.
1. Ground concrete and all types of excavation works
2. Flooring and wall covering works (screed, ceramic, tiles, carpet, etc.)
3. Necessary permits for building construction
4. Transport, transport insurance, and if required, provision of cranes and scaffolding.
5. External connections for the building (electricity, grounding line, wastewater and clean water, etc.)
6. Heating and cooling systems (radiators, air conditioning, etc.)
7. Kitchen upper and lower cabinets and bathroom cabinets
8. Telephone, TV, Computer, UPS, Data installation and fixtures.
9. Provision of electricity to be used during the installation.
10. Accommodation and meal costs for the team during out-of-town installations.
11. Protection of materials against theft at the installation site.