Let's Shape Your Ideas and Projects Together
Get a Quick Price!

PRODUCT DESCRIPTION
Product Name | Gölcük |
m² | 92m² |
NUMBER OF FLOORS | 1 |
NUMBER OF ROOMS | 3+1 |
LIVING ROOM | 19m² |
BEDROOM | 10-11-15m² (3 units) |
KITCHEN | 10m² |
BATHROOM | 5m² |
ENTRANCE | 5m² |
VERANDA | 2-9m² (2 units) |
BALCONY | - |
Prefabricated houses are made of fire-resistant A1 class non-flammable materials and are economical.
Heat balance is supported by PVC windows. Our houses are delivered to customers with calculations suitable for each region.
Projects are revised to bring our customers' desires to life.
Building Height | 250 cm |
Interior Wall | 6 cm – 10 cm (Optional) |
Interior Door | American Door |
Windows | White PVC Window |
Electrical Installation | Under Plaster |
Interior Wall Paint | Plastic Interior Wall Paint |
Exterior Walls | 10 cm |
Exterior Door | Steel Door |
Balcony Door | White PVC Door |
Roof Coating | Painted Galvanized Sheet, (Optional) Metal Tile, Shingle Coating |
Sanitary Installation | Under Plaster |
Exterior Wall Paint | Silicone Exterior Wall Paint |
Assembly of all building elements (wall panels and connection elements)
Installation of exterior door (Steel Door) and interior doors (American Door)
Installation of all windows, including double-glazing
Electrical wiring materials and installation (outlets, switches, fuses, lighting fixtures)
Plumbing materials and installation (waste and clean water pipework)
Procurement of sanitary ware (toilets, sinks, shower trays, faucets) excluding installation if specified in the project
Ceiling cladding, ceiling insulation, and roof covering
Interior & Exterior ceiling, metal component painting and priming, and silicon sealing
Loading of materials onto vehicles provided by the seller at the buyer's location
Ground concrete and excavation work
Floor and wall cladding work (screed, ceramic, tiles, carpet, etc.)
Permits required for building installation
Transportation, transportation insurance, and necessary equipment such as cranes and scaffolding
External connections for the building (electricity, grounding line, waste and clean water, etc.)
Heating and cooling installations (radiators, air conditioning, etc.)
Kitchen upper and lower cabinets and bathroom cabinets
Telecommunications, TV, computer, UPS, data wiring, and fittings
Electricity supply required during installation
Accommodation and meal costs for teams during out-of-town installations
Protection of materials at the installation site against theft